IN ADDITION TO CATEGORIZATION
Selected references
Installation of the David Černý’s BABIES project on the Praha- Město transmitter steel structure
Installation of the David Černý’s ENTROPA project in Brussels, DOX gallery and Pilsen Techmania
Installation of the David Černý’s SMALL CARS project in National Gallery in Prague, Veletržní, Prague 7
Installation of the Kryštof Kinter’ s LAMP project in the atrium of ČEZ, Duhová, Prague 4
Vertical transport of TRANE air conditioning units of 2,5 t up to the height of 70 m on the Praha – Město transmitter
Vertical transport of safe cabinets 0.7 t/pc to the Živnostenská Bank safe cabinets room.
Replacement of large format glasses of target facade of the National Theatre’s New Stage in Prague
Replacement of larger format glass in a restaurant +70 m in the building of the Praha – Město transmitter
Inspection and conservation of anchoring ropes of the highest steel structures in the CR- the +355 m Liblice transmitter
Demolition of masts - a mast of 150 m in Liblice I, a mast of 107 m Rafomyšl and a mast of 180 m in Litomyšl Pohodlí
Vertical transport and installation of bells Dykova, Prague 2 for Manoušek Bell-Founding
Vertical transport and installation of "St. Jacob ladder" bells for Manoušek Bell-Founding
Vertical transport and installation of bells within reconstructing LORETA’S chime for Manoušek Bell- Founding
Vertical transport and installation of the bells of the Church of Saint Giles, Prague 1 for Manoušek Bell - Founding
Ensuring safe moments at heights within shooting the "Miracles of nature" on the Praha – Město transmitter
Installation of the foil cover of the "Gulliver Airship" in the DOX gallery in Prague – Holešovice
...and other implementations
Photo gallery
-
David Černý’s “Entropa” project
-
David Černý’s “Babies” project
-
DOX - assembly of the Guliver covering
-
Transport of TRANE air conditioning units weighting 2.5 tonnes
-
MITAS windows replacement
-
Inspection and conservation of anchor ropes
-
Inspection of larger pipe diameters
-
Demolition of the 107 m high mast – Radomyšl
-
Core drilling
-
Painting of larger spaces and halls
-
Fixing “the Babies” using anchor tapes
-
DOX- Guliver sheathing
-
Blast cleaning using the JOS technology
-
Installing the David Černý’s “Babies” project
-
Maintaining building objects in terrain conditions